KERJA-KERJA  PENYELENGGARAAN TANGKI AIR :

(SILA KLIK PADA GAMBAR UNTUK BESARKAN)

 

KERJA MEMBAIKPULIH SEUNIT TANGKI 24,000 GALLONS UNTUK BEKALAN COOLING TOWER DI BANGUNAN ENGINEERING HOSPITAL RAJA PEREMPUAN ZAINAB II KOTA BHARU, KELANTAN.

 

      Highplus Engineeering Sdn Bhd     Highplus Engineeering Sdn Bhd

Several portion of steel wall and I beam rust due to leaking

                             Highplus Engineeering Sdn Bhd     Highplus Engineeering Sdn Bhd

Steel plate cover and trusses collapse due to rusting

      Highplus Engineeering Sdn Bhd   

      Job mobilized : Rehabilitation of water tank commence

    Highplus Engineeering Sdn Bhd   Highplus Engineeering Sdn Bhd   

Take out that plate blanket

       Highplus Engineeering Sdn Bhd    Highplus Engineeering Sdn Bhd   

Dangerous step/chopped the plate using oxitalene

       Highplus Engineeering Sdn Bhd    Highplus Engineeering Sdn Bhd  

Walk around in rusty sand and clayey

       Highplus Engineeering Sdn Bhd    Highplus Engineeering Sdn Bhd   

                                         Chopped steel as besi buruk           New I beam

       Highplus Engineeering Sdn Bhd    Highplus Engineeering Sdn Bhd   

Take away clayey deposit

       Highplus Engineeering Sdn Bhd    Highplus Engineeering Sdn Bhd   

       Surface preparation after wire brush , grinding , washing and drying

     Highplus Engineeering Sdn Bhd    Highplus Engineeering Sdn Bhd

Application of frp lining and sealant joint

   Highplus Engineeering Sdn Bhd Highplus Engineeering Sdn Bhd   

Roof trusses installation (using G.I. pipe)

       Highplus Engineeering Sdn Bhd     Highplus Engineeering Sdn Bhd   

              Application of epoxy coating as a finishing layer.Thru experience it can last up to 15 years.

     Highplus Engineeering Sdn Bhd    Highplus Engineeering Sdn Bhd  

                        External work and painting           Roof totally covered with fiberglass plate

     Highplus Engineeering Sdn Bhd    Highplus Engineeering Sdn Bhd

                  Manhole made from fiberglass composite    Fixing of 18� air vent

 Highplus Engineeering Sdn Bhd     Highplus Engineeering Sdn Bhd

                          Final touch and site clearing    Job Done

 

 

 

 

Best view using Internet Explorer 1024 x 768